Let MSR Surveying LTD provide the professional insights you need to maintain and enhance the value of your property assets.
MSR Surveying prepares a schedule of condition in London, Essex and the Home Counties. A schedule of condition records the exact state of a property at a fixed point in time, before a lease is signed or before building work starts next door for landlords, tenants and building owners. Schedules of Condition and Schedules of Defects are used in various scenarios, presented in an easy-to-understand format with accompanying photographs and drawings when applicable. Schedules of Condition are typically created before entering into a lease agreement, as part of an Award document under the Party Wall etc. Act 1996, and prior to any building work on leased properties. Schedules of Defects, on the other hand, are more targeted reports used before significant building work that may impact neighbouring properties.
Schedules of Condition document the state of premises intended for lease. When included in the lease agreement, they protect the tenant by limiting the landlord’s ability to claim for repairs under a Schedule of Dilapidations at the leaseās end.
Under the Party Wall etc. Act 1996Ā
A Schedule of Condition must be created for adjoining properties before proposed building work under the Party Wall etc. Act 1996. This schedule is attached to the Party Wall Award and is checked post-works to identify any damage.
Prior to Works on Leased Premises
Landlords usually require a Schedule of Condition before any alterations to leased premises to protect adjoining properties that could be affected. This schedule is also checked upon completion of the work to assess any damage and agree on remedial actions.
Before Major Building Work
Schedules of Defects focus on specific issues that have arisen and serve as a benchmark to evaluate potential future damage related to specific construction activities and their impacts.
Let MSR Surveying LTD provide the professional insights you need to maintain and enhance the value of your property assets.
| What it is | A dated record of the condition of a property at a fixed point in time, written up and supported by photographs |
| Most often used for | Commercial leases, works under the Party Wall etc. Act 1996, and alterations to leased premises |
| Who instructs one | Tenants, landlords, building owners and adjoining owners |
| What you receive | A written schedule, referenced photographs, drawings where they help, and a note of anything that could not be inspected |
| Related report | A schedule of defects, which records specific existing defects before major building work nearby |
| Fee | Quoted per property and instruction — ask for a quote with the address and the lease or works details |
| Areas covered | London, Essex and the Home Counties |
| Carried out by | RICS-qualified surveyors at MSR Surveying Ltd, an RICS-regulated firm |
Most commercial leases are full repairing and insuring, which obliges you to hand the premises back in repair at the end of the term. Without a record of how the premises were when you took them on, a landlord’s schedule of dilapidations can include defects that were already there on day one, and you are in the weak position of arguing from memory. A schedule of condition annexed to the lease fixes the starting point in writing, and caps the repairing obligation at the recorded state. It is agreed before the lease is signed, which is why it has to be commissioned early.
Under the Party Wall etc. Act 1996 the condition of the adjoining property is recorded before the notifiable works begin, and the schedule is attached to the party wall award. When the work is finished the property is inspected again against that record. It is the document that settles the question both sides end up asking — was that crack there before? Without it, the argument is unresolvable and usually expensive.
The three are routinely confused, and they do different jobs.
| Schedule of condition | Records the whole property as it is now, before a lease or before works. Protective and preventative. |
| Schedule of defects | Records specific existing defects, as a benchmark before major building work that could make them worse. |
| Schedule of dilapidations | Served by a landlord at or near the end of a lease, setting out the breaches of the repairing covenant and what it will cost to put them right. |
Before the lease is signed, or before notices are served and work starts. The value of the document is that it records a state nobody has altered yet, so once heads of terms are agreed or a contractor is on site its usefulness falls away quickly. If you are already in that position, tell us and we will say honestly whether a schedule is still worth commissioning.
A schedule of condition is a dated record of the state of a property at a fixed point in time, written up and supported by cross-referenced photographs. It is prepared before a lease is signed, or before notifiable building work begins, so that the condition at that moment can be proved later rather than argued over.
If the lease is full repairing and insuring, it is the main protection a tenant has. Without one, a landlord’s schedule of dilapidations at the end of the term can include defects that existed before you took occupation. Annexed to the lease, a schedule of condition caps the repairing obligation at the recorded state.
Before the lease is completed, or before party wall notices take effect and work starts on site. The document records a state that has not yet been altered, so its value falls away once a contractor is working or a tenant has begun fitting out.
No, and they sit at opposite ends of a lease. A schedule of condition records the premises as they are at the start. A schedule of dilapidations is served by the landlord at or near the end, listing breaches of the repairing covenant and the cost of remedying them.
It is not a statutory requirement in itself, but in practice it is prepared for the adjoining property before notifiable works begin and attached to the party wall award. The property is then re-inspected afterwards, and the schedule is the evidence used to decide whether damage is new.
It is quoted per property and per instruction, because the fee follows the size of the premises, how much of it is being recorded and the level of detail the lease or the award calls for. Send the address and the lease or works details and we will give you a fixed figure.
In most cases the building owner carrying out the works bears the surveying costs, including the record of the adjoining property’s condition. The exact allocation is set out in the award. MSR Surveying acts for building owners and adjoining owners alike — see our party wall surveyors page.